3D modelling stands as a pivotal cornerstone in the comprehensive suite of services provided by IBI. This intricate process marks the inaugural step toward establishing a robust and integrated model within the Building Information System (BIM), contributing significantly to the overall efficiency of project execution.
Within our operational framework, we systematically differentiate between six distinct Levels of Development (LOD). Tailoring each (LOD) to align with specific project phases, ensuring a nuanced approach to design and construction:
LOD 100 (Pre-design Stage):
As the project embarks on its journey, LOD 100 represents the pre-design stage, wherein the model incorporates 2D symbols and masses. These serve as placeholders, symbolizing the elemental existence within the envisioned structure.
LOD 200:
Progressing to LOD 200, the model transforms. Elements are no longer mere placeholders; instead, they are partially defined, outlining approximate quantities, sizes, shapes, and locations. This stage sets the foundation for a more detailed and precise representation.
LOD 300:
As the project advances, LOD 300 comes into play, bringing with it a heightened level of precision. At this stage, elements within the model are defined with exact dimensions and relative positions. The model results in a more accurate and detailed representation.
LOD 350:
Advancing further, LOD 350 encapsulates a detailed representation of each element. In addition to precise information about an element, it outlines its relationships and connections with other components in the system.
LOD 400:
The transition to LOD 400 marks a critical juncture in the development process. At this level, the model encapsulates fundamental information regarding the construction of various elements. It offers a more comprehensive understanding of the envisioned structure.
LOD 500:
The pinnacle of development, LOD 500, represents the culmination of the modelling process. At this stage, the model transcends virtual representation to simulate the real-life functions of elements within an actual building. It offers a dynamic and functional view that aligns closely with the practicalities of the built environment.
Post-3D modelling, IBI strategically leverages the information derived from the respective LODs to extract a myriad of benefits. Per the LOD specifications, the extraction of detailed workshop drawings, precise quantities and costs, and the identification of potential clashes are seamlessly executed. This systematic and meticulous approach ensures that the integration of design and construction processes is streamlined and enhances the overall efficacy of the building information system.
In conclusion, IBI’s commitment to excellence is exemplified through its systematic and detailed approach to 3D modelling and Levels of Development. By integrating these practices, IBI not only visualizes the design but also ensures precise execution of the subsequent phases of construction, resulting in a harmonious and efficient built environment.