SHARE

As we care about time as a constraint, we see the cost from the same prospect. The cost rules the capability of continuing the project or not. Exceeding the budget can affect the ability to bear the expenses or ruin the business case targets which may lead to the closure of the project before completion.

Because the BIM system is an integrated system, the cost was a must to be taken into consideration with Scheduling and modelling which is known as 5D BIM.

In IBI, we provide the cost control services included in our BIM services

In cost control, the client will have a good picture of the progression of the project and forecast the possible problems and be ready with a mitigation plan to recover the budget problems.